DBB P-1066 CH-53K Gearbox Repair & Test Facility MCAS, Cherry Point, NC
DBB P-1066 CH-53K Gearbox Repair & Test Facility MCAS, Cherry Point, NC
This project will construct a 31,627-SF H-53K gearbox repair and test facility and will include a disassembly area, kitting area, production control/clean parts area, assembly area for the main rotor gearbox, assembly area for the intermediate and tail rotor gearboxes, flushing room and integrated quality team area, main rotor gearbox test cell, nose gearbox test cell, and intermediate/tail rotor gearbox test cell. Constructs a CH-53K Gearbox Repair and Test Facility consisting of a single-story high bay building. Construction shall be reinforced masonry walls and steel columns supporting a steel frame and standing seam metal roof. A deep foundation system is included to support the building superstructure. The facility will include a disassembly area, parts kitting area, production control/clean parts area, assembly area for the main rotor gearbox, assembly area for the intermediate, nose, and tail rotor gearboxes, flushing room and integrated quality team area, main rotor gearbox test cell, nose gearbox test cell, and tail rotor/intermediate gearbox test cell. Sound attenuation will be provided in the test cells.
S10038 USCG Complex Project, MCB Camp Lejeune, NC
The work includes the construction of five facilities and associated sitework to include an Academic Instruction Facility, a Waterfront Instruction Facility, an Armory, an Ammunitions Storage, an Applied Instruction Facility, and incidental related work. Building A1 and Building BB54 will be demolished as part of this project. Buildings BB327, BB326 and BB346 will be renovated as part of this project.
S10039 P170 Ordnance Facilities Recap, Ph2 NWS Yorktown, VA
The work includes construction of five (5) Type-D earth-covered, high-explosive magazines, and incidental related work. The project demolishes a total of 16 magazines. Magazine construction will consist of foundations, walls, reinforced concrete floors, entrance and loading aprons, and ordnance bonding, grounding and lightning protection systems; intrusion detection systems (IDS) and earth-covering. Site preparations include clearing, excavation, grading and fill. A stream crossing involves wetland permit restrictions and mitigation. An optional railroad crossing involves a modular precast system. Special foundation features include rigid inclusions and load transfer platforms at the magazine locations on the site. Paving and site improvements include access roads, paved truck loading/unloading areas, concrete loading ramps, and landscaping. Electrical utilities include primary and secondary distribution systems, outside lighting, transformers, and telecommunications infrastructure. Mechanical utilities include storm water lines and open sand filters, and incidental related work.
